FreyssinetUK
> Articles by: Clare
Author Archive: Clare
Clare 1st September 2015
Blenheim Centre Post-tensioned System Client Blenheim Centre Principal Contractor Norwest Holst Frame Contractor Lancsville Construction Specialist Contractor Freyssinet Contract Value £1.6 million Contract Duration 10 months Works Completed February 2006 PDF Download Blenheim Centre in Hounslow was built in 2006….
Read more
Clare 1st September 2015
Slabstress – Royal Liverpool University Hospital Client Royal Liverpool and Broadgreen University Hospitals NHS Trust Engineer (Structures) TPS Lead Architect NBBT Contractor Carillion Frame Contractor Heyrod Construction PDF Download Work on the new Royal Liverpool University Hospital started in 2014. The…
Read more
Clare 1st September 2015
Reinforced Earth® Retaining Walls and Bridge Bearings Client Network Rail Contractor BAM Nuttall Engineer URS, Atkins, Donaldson Works Commenced December 2013 Works Completed September 2014 PDF Download The Scottish Borders had been without a railway since Lord Beeching’s cuts in…
Read more
Clare 1st September 2015
PT Slabs Client Hyde Group Principal Contractor Willmott Dixon Housing Structural Engineer Clancy Frame Contractor Mitchellson Post-tensioning Contractor Freyssinet Ltd Contract Duration 1 year Works Completed October 2011 PDF Download Located close to Bermondsey tube station, the Bermondsey Spa complex…
Read more
Clare 1st September 2015
Building Strengthening – Slabstress Client Life Care Residences Limited Engineer Pell Frischman Principal Contractor Vinci Construction Post-tensioning Contractor Freyssinet Ltd Works Completed December 2014 PDF Download Battersea Place is London’s first luxury retirement village. Located on Albert Bridge Road and overlooking…
Read more
Clare 1st September 2015
Post-tensioned Concrete Flat Slab system Client Aston University Principal Contractor Carillion Frame Contractor C J Haughey Specialist PT Contractor Freyssinet PT Designer Walsh Associates Structural Engineer Structural Engineer Partnership Value £65,000 PDF Download The £215M Aston Student Village scheme has provided…
Read more
Clare 1st September 2015
Pre-stressing Client Scottish Executive Principal Contractor Morgan Vinci JV Pre-Stressing Contractor Freyssinet Ltd Structural Engineer Jacobs Babtie Contract Value £1.1M Contract Duration 55 weeks Works Completed May 2008 PDF Download The Upper Forth Crossing at Kincardine was constructed to link…
Read more
Clare 1st September 2015
New Bridge Construction Client Moss Construction Principal Contractor Freyssinet Engineer David Dexter Associates Contract Value £400K Contract Duration 12 weeks PDF Download Spiceball Park Sports Centre in the centre of Banbury, Oxfordshire, was re-developed by Moss Construction. The ‘island site’…
Read more
Clare 1st September 2015
New structure strengthening Client Gatwick Airport Engineer (Structures) Bryden Wood Principal Contractor Vinci Construction Post-tensioning Contractor Freyssinet Ltd Works Completed September 2014 PDF Download The £184M scheme to replace Gatwick Airport’s pier 1 required demolition of the old pier and construction…
Read more
Clare 1st September 2015
Bridge Bearings and Shock Transmission Units – London Bridge Station Client: Network Rail Principal Contractor: Costain Works Commenced: January 2014 Works Completed: January 2015 PDF Download In a £1billion transformation by Network Rail, the London Bridge Station redevelopment aimed to improve…
Read more