Case Studies – Repairs – Bridges

M6 J16-19 Smart Motorways Bridge Repairs – Concrete Repairs & ICCP

M6 J16-19 Smart Motorways Bridge Repairs – Concrete Repair & Cathodic Protection Client Highways England Principal Contractor Carillion Kier JV Engineer Jacobs Specialist Supply Chain Partner Tarmac DOWNLOAD CASE STUDY PDF HERE As a strategic route connecting people, communities and businesses, the…
Read more

Expansion Joint Installation and Bridge Bearing Supply – Centenary Way Viaduct

expansion joint installation

Expansion Joint Installation and Bridge Bearing Supply – Centenary Way Viaduct, Burnley Client Lancashire County Council Contractor AE Yates Limited Works Commenced April 2015 Works Completed January 2016 DOWNLOAD PDF CASE STUDY The A682 Centenary Viaduct is a seven span…
Read more

Bridge Strengthening and Bearing Maintenance – M6 Toll Bridge

bearing maintenance

Bridge Strengthening and Bearing Maintenance – M6 Toll Bridges B443 & B518, Warwickshire Client Midland Expressway Limited (MEL) Works Commenced October 2015 Works Completed December 2015 CASE STUDY PDF DOWNLOAD Freyssinet was engaged by Midland Expressway Ltd in 2013 to carry…
Read more

Post-Tensioning, Strengthening and Concrete Repair – Hammersmith Flyover, Phase Two

Post-Tensioning, Strengthening and Concrete Repair Client Transport for London Main Contractor Costain Value £20 million Works Commenced December 2014 Works Completed Summer 2015 PDF Download Hammersmith Flyover is an elevated roadway in West London which carries the A4 dual carriageway over…
Read more