Tag Archive: M5 Golden Valley Bridge refurbishment

M5 Golden Valley project wins ICE South West Award

Bridge refurbishment

The M5 Golden Valley Bridge Refurbishment project was awarded the ‘Over £8m Re-engineered project’ at the ICE South West Civil Engineering Awards on 22 November 2022. The award was given in acknowledgement of the successful execution of a complex project,…
Read more

Bridge Strengthening & PTSI – M5 Golden Valley Bridge Refurbishment, Gloucestershire

Bridge Strengthening

Client: National HighwaysDesigner: Kier Highways Design ServicesPrincipal Contractor: MJ ChurchWorks Commenced: ECI February 2020 / On site November 2020Works Completed: 2022 Bridge Strengthening & Post-tensioning Special Inspection (PTSI) The M5 junction 11 Golden Valley Interchange comprises of two bridges supporting…
Read more

Work begins on M5 Golden Valley Bridge refurbishment scheme

Golden Valley Bridge refurbishment

Highways England’s Golden Valley Bridge refurbishment scheme has commenced. Freyssinet is providing temporary works design, concrete repairs, post-tensioning special inspection (PTSI) site surveys and investigation, bridge bearing supply and replacement, cathodic protection, hydro demolition and reinstatement of ballast walls and…
Read more