FreyssinetUK
> Articles by: Clare
Author Archive: Clare
Clare 26th June 2014
Harcombe Cross is located on the A38 between Exeter and Plymouth over the B3344, just north of Chudleigh. The A38 Harcombe Cross Bridge is a single span concrete slab deck carrying the A38 dual carriageway above, with a single carriageway…
Read more
Clare 5th June 2014
Ketley and Dawley Bridges refurbishment scheme on the M54 Telford was undertaken by Freyssinet between July 2013 and March 2014. The works consisted of the following: • Unsupported phased reinforced concrete repairs to abutments and piers • Replacement of Ketley…
Read more
Clare 3rd June 2014
Freyssinet recently held a successful morning of seminars at the National Motorcycle Museum in Birmingham. Thank you to all who attended and a special thanks goes out to our guest speakers, John Davies from Nicholls Colton and Ian Smith from…
Read more
Clare 21st May 2014
As part of our commitment to the sector and encouraged by our recent successful seminar in Leeds, we have arranged another seminar at the National Motorcycle Museum in Birmingham on 21st May. The two guest speakers at this event will…
Read more
Clare 16th May 2014
Freyssinet’s Autoripage® technique is used when a structure is built to one side of the track. When the rail blockade has been secured, the track and embankment are removed and the newly exposed ground is levelled. The structure is then…
Read more
Clare 1st May 2014
Freyssinet have been successful in tendering for Bridge Refurbishment works at Yanley Viaduct for North Somerset Council with a tender value in excess of £2m. Yanley Lane Viaduct carries the A370 Long Aston Bypass over Yanley Lane and the main…
Read more
Clare 1st May 2014
Freyssinet have been successful in tendering for Bridge Refurbishment works at Yanley Viaduct for North Somerset Council with a tender value in excess of £2m. Yanley Lane Viaduct carries the A370 Long Aston Bypass over Yanley Lane and the main…
Read more
Clare 16th April 2014
• Cambridge Mosaic Cambridge Mosaic is also known as The Marquee and consists of 7 levels of post-tensioned slabs and another 4 levels of RC slab and is currently the tallest building in Cambridge. The frame contractor is Getjar Ltd…
Read more
Clare 7th April 2014
As part of our ongoing commitment to the construction industry, Freyssinet are holding a corrosion, structural repair and post tensioning seminar at the National Motorcycle Museum, Birmingham on 21st May. Topic covered will include an overview of repair techniques and…
Read more
Clare 2nd April 2014
The M6 Toll connects M6 Junction 4 at the NEC to M6 Junction 11A at Wolverhampton with 27 miles (43 km) of six-lane motorway. Proposals were initially circulated in 1980. There followed two public enquiries, one in 1989 and another…
Read more