FreyssinetUK
> News
> Expansion joint replacement
Tag Archive: Expansion joint replacement
Clare 15th September 2025
Client: National HighwaysPrincipal Contractor: Balfour BeattyDesign: SwecoWorks Commenced: November 2022Works Completed: August 2023 The Myton Swing Bridge is an asymmetric cable-stayed structure featuring a steel twin box girder deck. It spans 55.6 metres at the front and 28.4 metres to…
Read more
Clare 14th February 2025
Client: TfLDesigner: Freyssinet Products Company (FPC)Principal Contractor: CostainWorks Commenced: November 2021Works Completed: June 2022 The A40 Westway Structures Refurbishment project is one of the Major Asset Renewal Programme (formally STIP2) projects, covering Westway Structures which carry the elevated A40 dual…
Read more
Clare 2nd January 2024
Freyssinet won the Quality Award for works on Myton Swing Bridge at the Balfour Beatty UKCS Regional Civils Supply Chain Awards 2023 at end of December. Freyssinet Site Engineer Conor Cusack is pictured accepting the award from Stephen Semple, Balfour…
Read more