FreyssinetUK
> Articles by: Clare
Author Archive: Clare
Clare 19th June 2012
Designed by Russian company Mostovik, and built by Russian general contractor USK Most, who subcontracted the construction to its subsidiary SK Most and Mostovik, the Russky Island Bridge will have a total length of 1,872 metres. It is made up…
Read more
Clare 19th June 2012
The Leadenhall Building is a 47 storey, 225 metre (737 ft) tall skyscraper, designed by Richard Rogers, which is currently under construction in London. With its distinctive wedge-shaped profile, it is informally referred to as the Cheese Grater and is…
Read more
Clare 19th June 2012
In early 2010 Freyssinet Makers, the Northern structural repair division of Freyssinet Ltd, was appointed by Balfour Beatty Civil Engineering to complete refurbishment works on the Forth Road Bridge. This included bridge bearing replacement, concrete repairs and the installation of…
Read more
Clare 15th May 2012
Freyssinet introduced post-tensioned concrete building floor slabs to the UK in the early 1980’s. Since that time they have championed post-tensioning technology and contributed to its acceptance as a standard system of construction. Offering a full service package, their in-house…
Read more
Clare 3rd May 2012
Freyssinet Limited has recently been awarded three further contracts within the Highways Agency Area 9 &10, Construction Management Framework. The works, which commenced on site in March 2012, include: • A40 Bridstow Bridge – Concrete bridge repair, cathodic protection, bearing…
Read more
Clare 2nd May 2012
In 2007, the future of Harlech swimming pool in Wales, which was built in the 1970s, was in doubt when Gwynedd Council decided it could no longer afford to run it. A community company set up to save Harlech swimming…
Read more
Clare 5th April 2012
Despite its many undoubted qualities, unfortunately concrete does not last for ever. The state of any potential concrete structure repair needs to be professionally assessed, so that the appropriate steps can be taken to ensure the safety of the structure,…
Read more
Clare 5th April 2012
Where the condition of your existing bearings are concerned, no one is more capable, or experienced to advise you than Freyssinet, the UK’s leading bridge bearing manufacturer and specialist in bridge bearing replacement. Freyssinet’s highly trained and experienced engineers, are…
Read more
Clare 5th April 2012
When you have a concrete structure that needs modification to prolong its lifespan, or a change of use needs to be accommodated, then strengthening is a possibility that should to be considered. Freyssinet are in a position to offer clients…
Read more
Clare 5th April 2012
Concrete deterioration is mostly caused by the combination of reinforcement corrosion which has been made worse by a surrounding concrete suffering from a reduction of alkalinity. The principle instigators of this form of deterioration can be carbonation and chloride attack….
Read more