Author Archive: Clare

Bearing and expansion joint replacement – Myton Swing Bridge

Myton Swing Bridge

Client: National HighwaysPrincipal Contractor: Balfour BeattyDesign: SwecoWorks Commenced: November 2022Works Completed: August 2023 The Myton Swing Bridge is an asymmetric cable-stayed structure featuring a steel twin box girder deck. It spans 55.6 metres at the front and 28.4 metres to…
Read more

Bearing replacement and temporary works – A2 Patrixbourne

scaffolding

Client: National HighwaysPrincipal Contractor: FreyssinetWorks Commenced: 2023Works Completed: 2024 Patrixbourne Bridge is a three-span supported overbridge constructed in 1974. The structure is located to the south of Canterbury and carries the A2 over Patrixbourne Road and the Nail Bourne waterway….
Read more